Touchstone Engineers designed a campus internet core switch relocation. Design included determining feasible locations for a redundant MDF, cable and fiber pathways (with OSHPD approval) and designing the MDF upgrade. A redundant UPS and redundant power distribution was added to the MDF. Cooling ducting and booster fans were added.
