Los Angeles Bank Data Center and Operations Center

May 20, 2021

Touchstone Engineers designed the replacement of a single UPS system with a 500kW 2N redundant system, the addition of a 900kW generator and ATSs to achieve 2N redundancy for the data center and operations center, EPO reconfiguration to reduce risk, and associated cooling and cooling power reliability upgrades. One of the new UPS systems was sourced, designed, installed and commissioned on rush basis after catastrophic failure of an existing UPS.