County Courthouse Data Center in Oregon

May 20, 2021

Touchstone Engineers led onsite commissioning of the newly built out County Courthouse facility which included a County data center.  Equipment included a Cummins 1.5MW standby generator with PGE utility-controlled dispatchable switchgear, rooftop PV array, an ATS, 2N redundant Eaton 250kW UPS systems, water-cooled CRAC units, water-source heat pumps, an EPO system, a heat recovery system and network monitoring of all critical support equipment. Unique Eaton UPS features tested included ECT (loading without load banks) and ESS and VMMS energy efficiency modes.