A comprehensive capacity and reliability assessment with two revisions over six years of the data center with 22,000 Sq. Ft. of access floor space led to a UPS upgrade design and commissioning project. An end-of-life N+1 UPS system was replaced with a 1.5MW 2N redundant system and cooling power was reconfigured to reduce single-point failure risk.